Plant and production range of the Linz Steelworks. Original quality co
ntrol based on a production specification file. Requirements placed on
the computer-assisted quality assurance system. Development of a new
system using computerized specifications and automatic defect forecast
ing. Implementation of the system in several steps between 1983 and 19
93. Key features ensuring system reliability include monitoring of mea
suring equipment, use of statistical process control, and collection o
f feedback data from the rolling mill. Accomplished production and qua
lity improvements: 83% of slabs produced require no inspection or trea
tment, 72% reduction in scarfing loss, 80% decrease in strip re-inspec
tions necessitated by metallurgical defects.