PREDICTION OF RIVER DISCHARGE AT UNGAGED SITES WITH ANALYSIS OF UNCERTAINTY

Citation
Ru. Murdock et Js. Gulliver, PREDICTION OF RIVER DISCHARGE AT UNGAGED SITES WITH ANALYSIS OF UNCERTAINTY, Journal of water resources planning and management, 119(4), 1993, pp. 473-487
Citations number
13
Categorie Soggetti
Engineering, Civil","Water Resources
ISSN journal
07339496
Volume
119
Issue
4
Year of publication
1993
Pages
473 - 487
Database
ISI
SICI code
0733-9496(1993)119:4<473:PORDAU>2.0.ZU;2-K
Abstract
A technique is outlined for assigning uncertainty to the estimation of cumulative probability distribution functions (flow-duration curves) for river discharge at ungaged sites. Data from existing stage-dischar ge gaging stations are used to determine a best-fit exponent for the a djustment of gaged data to a site within the watershed, and to estimat e the uncertainty associated with said adjustment. Average annual disc harge is shown to be a good indicator of the required adjustment and u ncertainty of cumulative probability distribution functions, especiall y when applied to mean expected discharge through a water-development project. The distribution of the actual values around the predicted is log-normal, with a simple power relationship between discharge and dr ainage area describing the median values. In this paper, the applicati on is to flow-duration curves for the addition of hydropower capacity.