A field study was conducted at the 55 MGD Dammam (Saudi Arabia) wastew
ater treatment plant employing the carrousel system, to evaluate its o
verall performance with particular emphasis on nitrogen removal. The r
esults of the study showed that the plant achieved greater than 93% BO
D removal, 99% ammonia reduction, and 93% TKN removal. The plant readi
ly met the secondary effluent BOD5 requirement with an average BOD5 co
ncentration of 8.2 mg l(-1), but barely satisfied the SS standard with
effluent SS averaging around 29 mg l(-1). While the average total eff
luent nitrogen was 4.4 mg l(-1), nitrification-denitrification account
ed for about 45% of the total nitrogen removal. The system kinetics fo
r BOD5 and ammonia removal conformed to the plug-flow first-order kine
tic model. Kinetic parameters estimated in this study were well within
literature values.