SETTING PLANNED LEADTIMES IN CAPACITY REQUIREMENTS PLANNING

Citation
H. Matsuura et H. Tsubone, SETTING PLANNED LEADTIMES IN CAPACITY REQUIREMENTS PLANNING, The Journal of the Operational Research Society, 44(8), 1993, pp. 809-816
Citations number
9
Categorie Soggetti
Management,"Operatione Research & Management Science","Operatione Research & Management Science
ISSN journal
01605682
Volume
44
Issue
8
Year of publication
1993
Pages
809 - 816
Database
ISI
SICI code
0160-5682(1993)44:8<809:SPLICR>2.0.ZU;2-L
Abstract
This paper deals with the problem of determining planned leadtimes in a periodic loading system, such as 'Material Requirements Planning.' A method for determining planned leadtime for an individual job, based upon the operation time for the job, is presented from the standpoint that the planned leadtime should be determined under a management poli cy, taking a trade off between work-in-process quantities and capacity requirements variations into consideration. The proposed method, whic h is derived with Lagrange's method of indeterminate coefficients, can minimize capacity requirements variations under a given average loadi ng time, under general operation time distributions.