MANAGING THE SANTA-ROSA OPEN-PIT, HEAP-LEACH GOLD PROJECT

Citation
Rr. Fernandez et al., MANAGING THE SANTA-ROSA OPEN-PIT, HEAP-LEACH GOLD PROJECT, JOM, 49(4), 1997, pp. 15-17
Citations number
NO
Categorie Soggetti
Metallurgy & Metallurigical Engineering",Mineralogy,"Material Science
Journal title
JOMACNP
ISSN journal
10474838
Volume
49
Issue
4
Year of publication
1997
Pages
15 - 17
Database
ISI
SICI code
1047-4838(1997)49:4<15:MTSOHG>2.0.ZU;2-M
Abstract
Greenstone Resources Ltd. constructed and operates the Santa Rosa open -pit, heap-leach gold mine in Veraguas, Panama, which was commissioned in 1995 at a designed capacity of 1.8 million tonnes per year. The or e exhibits a long three-year leach cycle and requires three-stage crus hing to achieve an average gold recovery of 74 percent. The crushing p lant handles a high volume of clay material, and the circuit includes a Barmac crusher. In order to control the water balance (average rainf all is more than three meters of water per year), Greenstone developed the means to successfully operate this low-grade gold deposit under d ifficult operating conditions.