Three-phase power cables installed between the inverter and motor of a
s drive systems have been mostly ignored in the years since ac drives
have became widely accepted in industrial applications, However, cable
characteristics have become quite critical with the advent of faster
inverter switching times, which have decreased by a factor of perhaps
20:1 in the last ten years, This paper describes the present areas of
concern with regard to the power cabling, as well as a test program to
quantitatively evaluate cable-related remedies for these problematic
areas, a relative ranking of test results is developed comparing the e
ight cable types tested, Cable connector considerations are examined,
together with interconnection of the cable shield, or sheath, and the
NEC ground circuits are discussed in light of the test results and rec
ommendations presented, Cable voltage ratings are discussed and recomm
endations made, A final cable total performance comparison, including
installation factors, summarizes the paper.