This paper is an extension of a previous work where a product could be assi
gned to only one of its feasible cells. Here, that assumption is relaxed an
d lot-splitting is allowed. The impact of lot; splitting is also discussed
in terms of setup times. The proposed approach has two phases; 1) generatin
g alternative operator levels, and 2) finding the optimal operator and prod
uct assignments to the cells. Mathematical models proposed in the previous
work are modified to allow for lot-splitting and to consider setup times. T
he results obtained by using the same example problem are discussed later i
n the paper. (C) 1998 Published by Elsevier Science Ltd. All rights reserve
d.