D. Bommisetty et al., Scheduling collection of recyclable material at Northern Illinois University campus using a two-phase algorithm, COM IND ENG, 35(3-4), 1998, pp. 435-438
This paper considers the problem of collecting recyclable materials in a la
rge university campus with many buildings. It models the problem as a vehic
le routing problem with additional constraints and applies a two-phase algo
rithm in order to provide a heuristic solution. (C) 1998 Published by Elsev
ier Science Ltd. All rights reserved.