Circuit-breaker requirements for alternative configurations of a 500 kV transmission system

Citation
Pcv. Esmeraldo et al., Circuit-breaker requirements for alternative configurations of a 500 kV transmission system, IEEE POW D, 14(1), 1999, pp. 169-175
Citations number
13
Categorie Soggetti
Eletrical & Eletronics Engineeing
Journal title
IEEE TRANSACTIONS ON POWER DELIVERY
ISSN journal
08858977 → ACNP
Volume
14
Issue
1
Year of publication
1999
Pages
169 - 175
Database
ISI
SICI code
0885-8977(199901)14:1<169:CRFACO>2.0.ZU;2-2
Abstract
This paper describes the study made to assess the electrical stresses impos ed on line circuit breakers of a new 500kV, AC expansion of the FURNAS tran smission system, to be possibly installed in the Brazilian central region. The study has considered three configurations of the transmission lines, tw o of which assuming the use of compact towers. In one of these two cases th e lines would have high surge-impedance loading. Digital simulations have b een made with the aid of the Alternative Transients Program (ATP) to calcul ate the switching transients appearing as a result of line energization and reclosing, clearing of terminal and short-line faults, no-load line openin g in normal and faulted conditions, and out-of phase switching. Four altern atives have been considered for the limitation of overvoltages on closing, assuming either the sole use of surge arresters on each line end or the use , in addition to the arresters, of pre-insertion resistors, synchronizers o r time relays to provide a staggered closing of the breaker poles. The stre sses obtained were compared with those applied by the standard IEC tests or with the maximum admissible levels usually considered by the utility for i ts transmission branches at the planning stage.