Eutrophication of the lower Nakdong River after the construction of an estuarine dam in 1987

Citation
Hw. Kim et al., Eutrophication of the lower Nakdong River after the construction of an estuarine dam in 1987, INT REV HYD, 83, 1998, pp. 65-72
Citations number
21
Categorie Soggetti
Aquatic Sciences
Journal title
INTERNATIONAL REVIEW OF HYDROBIOLOGY
ISSN journal
14342944 → ACNP
Volume
83
Year of publication
1998
Pages
65 - 72
Database
ISI
SICI code
1434-2944(1998)83:<65:EOTLNR>2.0.ZU;2-I
Abstract
The lower Nakdong River has became a "reservoir-river hybrid" since the con struction of an estuarine dam in 1987. Due to the increased nutrient input from the middle part of the river and a longer hydrologic retention due to the estuarine dam, phytoplankton biomass (chi. a) was increased from 28+/-2 3 mu g/l (1982-87) to 60+/-152 mu g/l (1989-96) while phytoplankton blooms occurred frequently. Nutrient concentrations (mg/l) also increased during t he same period (NO3-N: 0.9 to 2, TN: 1.9 to 3.6, PO4-P (mu g/l): 40 to 200) . Since 1992, Microcystis (blue-green algae) in summer and Stephanodiscus ( diatom) bloom in the winter repeatedly occurred. Steady increase in daily w ater intake at the lower part of the river is also a major cause for the ac celeration of eutrophication.