In a deregulated environment, independent generators and utility generators
may or may not participate in the load-frequency control of the system. Fo
r the purpose of evaluating the performance of such a system, a flexible me
thod has been developed and implemented. The method assumes that load frequ
ency control is performed by an ISO based on parameters defined by the part
icipating generating units. The participating units comprise utility genera
tors and independent power producers. The utilities define the units, which
will be under load-frequency control, while the independent power producer
s may or may not participate in the load frequency control. For all the uni
ts, which participate in the load-frequency control, the generator owner de
fines (a) generation limits, (b) rate of change and (c) economic participat
ion factor. This information is transmitted to the ISO. This scheme allows
the utilities to economically dispatch their own system, while at the same
time permit the ISO to control the interconnected system operation. (C) 199
9 Elsevier Science B.V. All rights reserved.