A novel satellite footprint design is presented in order to mitigate the GS
M synchronisation problems, caused by the potential wide variety of require
d timing advances, during the access phase of the signalling procedure. It
is applied to LEO and MEO constellations and for different satellite channe
l parameters. Different approaches are presented and their tradeoff in term
s of signalling load is discussed.