In practical manufacturing settings it is often possible to obtain, in real
-time, information about the operation of several machines in a flexible ma
nufacturing system (FMS) that ran be quite useful in scheduling part flows.
In this brief paper the authors introduce some scheduling policies that ca
n effectively utilize such information (something the policies in [1] do no
t do) and they provide sufficient conditions for the stability of two such
policies.