We have constructed a large new dilution refrigerator for use with the new
Lancaster nuclear cooling facility. The machine is housed in a purpose-rebu
ilt suite of rooms and has been designed to have a very low base temperatur
e, a very low heat leak environment and to run for long periods between ref
rigerant refills. The machine has been operated in continuous mode down to
similar to 1.75 mK and can run for 10 days between refills. Preliminary nuc
lear cooling experiments suggest that even with an experiment attached the
mixing chamber can still run below 2 mK.