A gain-scheduled L-2 control to nuclear steam generator water level

Citation
Mk. Kim et al., A gain-scheduled L-2 control to nuclear steam generator water level, ANN NUC ENG, 26(10), 1999, pp. 905-916
Citations number
8
Categorie Soggetti
Nuclear Emgineering
Journal title
ANNALS OF NUCLEAR ENERGY
ISSN journal
03064549 → ACNP
Volume
26
Issue
10
Year of publication
1999
Pages
905 - 916
Database
ISI
SICI code
0306-4549(199907)26:10<905:AGLCTN>2.0.ZU;2-Y
Abstract
This paper is concerned with the design of a gain-scheduled controller with guaranteed L-2 performance for the water level control of a nuclear steam generator which has parameter varying dynamics. The proposed controller gua rantees both stability and a prescribed L-2 performance in the entire opera ting region. The systematical design method for the controller which is aut omatically adjusted along the reactor power, in terms of Linear Matrix Ineq ualities (LMIs), is shown. The main benefit of this method is to avoid most of difficulties such as gain-interpolation or griding technique in a class ical gain scheduling control. The computer simulation demonstrates the effe ctiveness of the proposed controller in full operating range and its superi ority to conventional PID controllers. (C) 1999 Published by Elsevier Scien ce Ltd. All rights reserved.