Ai. Kiryushin et al., PROJECT OF THE GT-MHR HIGH-TEMPERATURE HELIUM REACTOR WITH GAS-TURBINE, Nuclear Engineering and Design, 173(1-3), 1997, pp. 119-129
In February 1995, MINATOM of Russia and General Atomics (USA) signed t
he Agreement for the development and design of the GT-MHR facility wit
h a modular helium reactor and a gas turbine intended to be constructe
d in Russia. This Agreement was subsequently expanded by the participa
tion of Framatom and Fuji Electric. The GT-MHR facility is designed fo
r burning weapons-grade plutonium and utilization of the heat produced
in the direct gas-turbine cycle with electricity production efficienc
y of about 50%. In future such facilities with uranium fuel will be pr
oposed for use as commercial NPPs. A GT-MHR prototype and fuel product
ion facility are intended to be constructed at the Siberian Chemical C
ombine in Seversk (Tomsk-7). In accordance with the Agreement, a conce
ptual design of the GT-MHR should be developed in September 1997. As a
part of the conceptual design, a reactor module with a power conversi
on system is being designed and plutonium fuel is being developed. (C)
1997 Elsevier Science S.A.