Jg. Baek et al., A BATCH SCHEDULING SCHEME FOR THE WORK-CENTER THAT SUPPLIES PARTS TO A MIXED-MODEL ASSEMBLY-LINE, Computers & industrial engineering, 33(3-4), 1997, pp. 757-760
The factory considered in this study consists of a mixed-model assembl
y line and a workcenter. The mixed-model assembly line (main line) sim
ultaneously produces different product models whose assembly parts are
provided in batches by the workcenter. The main purpose of this study
is to develop a batch scheduling scheme for the workcenter. The objec
tive function of the scheduling is to provide parts for the main line
without delays. The problems that make the scheduling challengeable ar
e as follows : (1) different product models being simultaneously produ
ced on the main line require different parts and (2) space for part in
ventory in the workcenter is limited. This study presents two batch sc
heduling approaches used to build a real system for the workcenter. (C
) 1997 Elsevier Science Ltd.