STOCHASTIC-ANALYSIS OF A U-SHAPED PRODUCTION LINE WITH MULTIPLE WORKERS

Authors
Citation
K. Nakade et K. Ohno, STOCHASTIC-ANALYSIS OF A U-SHAPED PRODUCTION LINE WITH MULTIPLE WORKERS, Computers & industrial engineering, 33(3-4), 1997, pp. 809-812
Citations number
6
ISSN journal
03608352
Volume
33
Issue
3-4
Year of publication
1997
Pages
809 - 812
Database
ISI
SICI code
0360-8352(1997)33:3-4<809:SOAUPL>2.0.ZU;2-Y
Abstract
In a conveyor system for mass production as in the Ford system, each s tation processes just one item in one cycle time, where the cycle time is the time-interval between two successive outputs In a Just-in-Time production system, a single-unit production and conveyance system is applied to a part production line without conveyors, and multi-functio n workers and a U-shaped layout of machines have been introduced. The multi-function worker takes charge of multiple machines. In this paper , we consider a U-shaped line with multiple multi-function workers, ea ch of which is responsible for several machines. We formulate it into a marked Petri net. which has a convex property of a generalized semi- Markov process. This shows that the cycle times of two different syste ms are comparable in the sense of an increasing convex order. We also show the reversibility of the system, that is. the expected cycle time of the reversed system where each worker operates items and walks in the reversed order of stations is the same as that of the original sys tem. (C) 1997 Elsevier Science Ltd.