SOME FEATURES OF RESERVES RECOVERY AND PR OCEDURES FOR PLANNING OF OPERATIONS ON WATER INFLOW LIMITATION IN MASSIVE POOL OF AB(4-5) FORMATION AT THE LATE-STAGE OF PRODUCTION
Aa. Ruchkin et al., SOME FEATURES OF RESERVES RECOVERY AND PR OCEDURES FOR PLANNING OF OPERATIONS ON WATER INFLOW LIMITATION IN MASSIVE POOL OF AB(4-5) FORMATION AT THE LATE-STAGE OF PRODUCTION, Neftanoe hozajstvo, (10), 1997, pp. 58-61
It is shown, that oil recovery efficiency increase in conditions of lo
w production rates and high water cuts could be guaranteed by large-sc
ale implementation of oil production stimulation technologies, current
and final oil recovery factors increase. The approaches are given for
application of one of the production stimulation technologies - water
inflow limitation in production wells, and AB4-5 formation at Samotlo
r field is used as an example. The results of technology implementatio
n are enclosed.