Major repairment activities were performed at the Triga Mark III resea
rch reactor of the Nuclear Centre of Mexico during which the air extra
ction system was put out of order for several weeks. A nuclear detecto
r monitoring system, showed radiation signals well above the expected
alarm values. After careful analysis of the problem, it was identified
that indoor radon build up was the reason for those abnormal radiatio
n signals.