CYCLIC SCHEDULING OF A HOIST WITH TIME WINDOW CONSTRAINTS

Citation
Hx. Chen et al., CYCLIC SCHEDULING OF A HOIST WITH TIME WINDOW CONSTRAINTS, IEEE transactions on robotics and automation, 14(1), 1998, pp. 144-152
Citations number
12
Categorie Soggetti
Robotics & Automatic Control","Robotics & Automatic Control","Engineering, Eletrical & Electronic
ISSN journal
1042296X
Volume
14
Issue
1
Year of publication
1998
Pages
144 - 152
Database
ISI
SICI code
1042-296X(1998)14:1<144:CSOAHW>2.0.ZU;2-9
Abstract
This paper proposes a model and a related algorithm for generating opt imal cyclic schedules of hoist moves with time window constraints in a printed circuit board (PCB) electroplating facility. The algorithm is based on the branch and bound approach and requires the solution of a specific class of linear programming problems (LPP's), These LPP's ar e equivalent to the problems of the cycle time evaluation in bi-valued graphs, Computational experience is presented to compare the results obtained using this new algorithm with the ones proposed in the litera ture.