It is very important both to use low price ore for the sinter plant an
d to improve the sinter high temperature properties in view of high PC
I rate. At the Kokura sinter plant, the granulation of the sinter mixt
ure has been improved by introducing a high agitating mixer. The sinte
ring operation using low price ore is now carried out successfully. Th
e high temperature behaviour is improved by reducing the SiO2 content
in the sinter, and a pulverized coal injection rate up to 180 kg/thm h
as been achieved at the Kokura blast furnace.