Bp. Das et al., OFF-LINE SCHEDULING A SIMPLE CHEMICAL BATCH PROCESS PRODUCTION PLAN USING THE ILOG SCHEDULER, Computers & chemical engineering, 22, 1998, pp. 947-950
This paper considers the application of event based constrained logic
programming solutions for a typical multipurpose multistage batch proc
ess scheduling problem using the ILOG scheduler software package, wher
e resource requirements such as equipment items and feed materials etc
. are considered in various combinations. The aim is to contrast the a
pproach with established mathematical programming approaches. The solu
tion is based on a heuristic approach where the process route of each
product is considered separately along with their resource requirement
s and each product is made in a campaign mode, where more than one bat
ch of particular activity might be performed within a cycle, so that t
he material balance within the system can be maintained. These solutio
ns can be generated within very modest computation time but require co
nsiderable preprocessing of the input data. This work has shown that t
he ILOG system is fairly flexible and readily interfaced with external
systems and can cope with the various constraints imposed on the prob
lem. However, further work is required for testing large scale industr
ial problems. (C) 1998 Published by Elsevier Science Ltd. All rights r
eserved.