METHODOLOGY FOR PRIORITIZING COST-EFFECTIVE CONSTRUCTION TECHNOLOGIES

Citation
Y. Rosenfeld et al., METHODOLOGY FOR PRIORITIZING COST-EFFECTIVE CONSTRUCTION TECHNOLOGIES, Journal of construction engineering and management, 124(3), 1998, pp. 176-184
Citations number
23
Categorie Soggetti
Construcion & Building Technology","Engineering, Civil","Engineering, Industrial
ISSN journal
07339364
Volume
124
Issue
3
Year of publication
1998
Pages
176 - 184
Database
ISI
SICI code
0733-9364(1998)124:3<176:MFPCCT>2.0.ZU;2-T
Abstract
This paper presents a study carried out by Technion and the constructi on department of the Israeli air force, with the objective of identify ing opportunities for shortening the duration of construction projects by the adoption of innovative construction technologies in selected a reas. This study focused on technological aspects and did not deal wit h the examination of management practices or organizational issues. Pr omising candidates for technological improvement were identified and p rioritized by means of a comprehensive in-depth survey conducted among the organization's most experienced experts. The survey was aimed at the use of multidimensional Pareto analysis, which distinctly identifi ed (1) the technological resources, (b) the types of projects, and (c) the types of activities that would make the most effective impact. Th e partial results were intersected mutually to single out the most pot ent combinations. This paper describes both the method and the results of the analysis.