M. Rothman, OPERATION WITH BIOLOGICAL NUTRIENT REMOVAL WITH STABLE NITRIFICATION AND CONTROL OF FILAMENTOUS GROWTH, Water science and technology, 37(4-5), 1998, pp. 549-554
Citations number
4
Categorie Soggetti
Water Resources","Environmental Sciences","Engineering, Civil
Bromma WWTP is the second largest wastewater treatment plant in Stockh
olm, Sweden. To meet new regulations regarding nitrogen removal the pl
ant needs to be operated with nitrogen removal all year round; In prev
ious years, severe bulking problems during the winter have made it imp
ossible to maintain nitrification during colder temperatures. Microsco
pic examination of the activated sludge has increased the understandin
g of bulking. The bulking is mainly due to excessive growth of filamen
tous organisms, mainly Microthrix parvicella. By operating the plant w
ith a high F/M ratio and decreasing the FIM ratio when filamentous gro
wth occurs, excessive growth of these organisms Can be-avoided. The ni
trification rate is optimized by adjusting the concentration of mixed
liquid suspended solids in the tanks so that the nitrification is comp
lete and by operating the tanks at a DO concentration of 4 mg/l. By th
is process strategy it is now possible to operate the plant with nitri
fication all year round. (C) 1998 IAWQ. Published by Elsevier Science
Ltd.