Kg. Kempf et al., SCHEDULING A SINGLE BATCH PROCESSING MACHINE WITH SECONDARY RESOURCE CONSTRAINTS, Journal of manufacturing systems, 17(1), 1998, pp. 37-51
Citations number
14
Categorie Soggetti
Engineering, Manufacturing","Operatione Research & Management Science","Engineering, Industrial
This paper studies the problems of minimizing total completion time (S
igma C-i) and makespan (Cmax) on a single batch processing machine wit
h job families and secondary resource constraints. The motivation for
this problem is the burn-in operation in the final testing stage of se
miconductor manufacturing, where both oven capacity and the number of
boards available may constrain scheduling decisions. Because both prob
lems are NP-hard, integer programming formulations are developed for s
pecial cases and are then used to develop heuristics. Extensive comput
ational experiments show that the heuristics are capable of consistent
ly obtaining good solutions in modest CPU times.