It has been measured the ratio between the refrigerant flow and the ca
sting speed and the appropriate range of this ratio to avoid the advan
ce or delay of the solidification front has been determined. By means
of a variable flow of N-2 at the exit zone of the copper tubes the imp
rovement of heat transmission in the mould and of the internal surface
quality of the cast tubes was achieved.