OPTIMAL-DESIGN OF A GENERALIZED CONVEYOR-SERVICED PRODUCTION STATION - FIXED AND REMOVAL ITEM CASES

Citation
Sa. Feyzbakhsh et al., OPTIMAL-DESIGN OF A GENERALIZED CONVEYOR-SERVICED PRODUCTION STATION - FIXED AND REMOVAL ITEM CASES, International journal of production economics, 55(2), 1998, pp. 177-189
Citations number
22
Categorie Soggetti
Engineering,"Engineering, Manufacturing
ISSN journal
09255273
Volume
55
Issue
2
Year of publication
1998
Pages
177 - 189
Database
ISI
SICI code
0925-5273(1998)55:2<177:OOAGCP>2.0.ZU;2-Y
Abstract
This paper treats an approach to the optimal design of the conveyor sy stem such that arrival/service times vary in a probabilistic manner. T he single station model here considered is both cases of a single gene ralized conveyor-serviced production station (generalized CSPS) by Mat sui (1993), i.e., fixed item case (FIC) and removal item case (RIC). A methodology to design simultaneously both cycle (mean-interarrival) t ime and buffers is proposed, and the two-step method and the Complex-t ype method for FIC and RIG, respectively, are given and discussed nume rically. In addition, by use of the proposed methods the effectiveness of the look-ahead time are included. (C) 1998 Elsevier Science B.V. A ll rights reserved.