This paper discusses the dynamics of a hybrid production riser designe
d for a water depth of 1500 m in the harsh environment west of Shetlan
d where one of the main design drivers is offshore installation time.
To minimise installation time, a free standing riser was developed com
prising a carrier pipe, top and bottom taper sections and an integral
subsurface buoy connected by flexibles to the moored FPSO. The paper d
iscusses the different dynamic characteristics of the structure during
tow out, upending, connection and when installed. The simulation meth
ods used, the design drivers, design compromises and parameter sensiti
vities are also discussed. It is concluded from extensive dynamic anal
ysis and structural design that the proposed design is feasible and th
e estimated on-site installation time is 2-3 weeks. (C) 1998 Elsevier
Science Ltd. All rights reserved.