H. Sevim et Dd. Lei, THE PROBLEM OF PRODUCTION PLANNING IN OPEN-PIT MINES, INFOR. Information systems and operational research, 36(1-2), 1998, pp. 1-12
Citations number
14
Categorie Soggetti
Operatione Research & Management Science","Computer Science Information Systems","Operatione Research & Management Science","Computer Science Information Systems
The variables in open pit mine production planning interact in a circu
lar fashion, that is, without knowledge of one variable the next varia
ble in the circle cannot be determined. Fixing or assuming the values
of one or more variables along this circle will lead to inferior plann
ing. An efficient plan will require simultaneous solution to the varia
bles in the circle. However, such a solution is not easy to obtain due
to the complexity and shear size of the problem. During the last thre
e decades, partial solutions have been found using operations research
techniques and heuristic algorithms. In this paper, a recently develo
ped method which utilizes a combination of a heuristic algorithm and a
dynamic programming formulation is described. This method brings the
required simultaneous solution to the problem. An actual example is al
so given to illustrate the new method.