STEAM-TURBINE RISK ASSESSMENT PROJECT INSPECTION AND OVERHAUL OPTIMIZATION OF STEAM-TURBINES

Citation
Jw. Biggs et al., STEAM-TURBINE RISK ASSESSMENT PROJECT INSPECTION AND OVERHAUL OPTIMIZATION OF STEAM-TURBINES, Tappi journal, 81(9), 1998, pp. 149-156
Citations number
10
Categorie Soggetti
Materials Science, Paper & Wood
Journal title
ISSN journal
07341415
Volume
81
Issue
9
Year of publication
1998
Pages
149 - 156
Database
ISI
SICI code
0734-1415(1998)81:9<149:SRAPIA>2.0.ZU;2-P
Abstract
The pulp and paper industry wants to increase time between overhauls o f steam turbines to reduce direct overhauling and inspection costs. Ma chinery engineers sometimes express the basis for justifying additiona l overhaul and inspection work as a ''risk of failure.'' The aim of th e Steam Turbine Risk Assessment Project (STRAP) was to develop a metho dology and model to address optimization of overhauls by identifying a nd quantifying the ''risk of failure'' associated with maintenance, op eration, and engineering practices applied to steam turbines. This pap er details model development, demonstrates model application to evalua te a turbine, and displays the results achieved through testing of the analysis.