This paper will discuss the progress achieved in the ARBRE project, a
joint venture that includes Yorkshire Water Projects of the United Kin
gdom and Termiska Processer AB of Sweden. The project will be fuelled
by a mix of wood from forestry residues and from short rotation coppic
es, some of which will be organically fertilised with digested sewage
sludges. A Biomass Integrated Gasification Combined Cycle (BIGCC) elec
tricity generation plant will be constructed at Eggborough, North York
shire, which will provide gas to a gas turbine and steam turbine gener
ation system, producing 10 MW and exporting 8 MW of electricity. It ha
s been included in the 1993 tranche of the UKs Non Fossil Fuel Obligat
ion (NFFO) and has gained financial support from the European Commissi
on's THERMIE programme as a targeted BIGCC project. The following aspe
cts will be described in the paper: technical design; award of plannin
g permission, including environmental issues and benefits; fuel suppli
es; short rotation coppice establishment; project timescales. (C) 1998
Elsevier Science Ltd. All rights reserved.