Dh. Lee et Yd. Kim, ITERATIVE PROCEDURES FOR MULTIPERIOD ORDER SELECTION AND LOADING PROBLEMS IN FLEXIBLE MANUFACTURING SYSTEMS, International Journal of Production Research, 36(10), 1998, pp. 2653-2668
Citations number
19
Categorie Soggetti
Engineering,"Operatione Research & Management Science
This paper focuses on multi-period order selection and loading problem
s in flexible manufacturing systems. The multi-period order selection
problem is the problem of selecting orders to be produced in each peri
od during the upcoming planning horizon, and the loading problem invol
ves allocation of operations and required tools to machines for orders
selected in each period. The objective is to minimize earliness and t
ardiness costs and subcontracting costs. The earliness and tardiness c
osts are incurred if an order is not finished on time, while subcontra
cting cost is incurred if an order is not selected within the planning
horizon (and must be subcontracted) due to limits in processing time
capacity and the tool magazine capacity of the machines. To solve the
two problems simultaneously, we develop four iterative procedures in w
hich the multi-period order selection and loading problems are solved
repeatedly until a good solution is obtained. To compare the four iter
ative procedures, computational experiments are done on randomly gener
ated test problems and the results are reported.