This paper describes an investigation into the trade-off between capacity,
inventory and variance reduction techniques for buffering against uncertain
ty and model mix fluctuations in a manufacturing cell. The cell is patterne
d after one that produces engine blocks which feed directly on to the assem
bly line at a plant manufacturing large diesel engines. A simulation model
is used to evaluate the effect of different buffering techniques on capacit
y utilization, throughput time and output rate. Two production control syst
ems are used in the cell, one based on a pull approach, the other on a push
approach. The results show that variance reduction and capacity increases
are serious alternatives to using inventory for buffering in either system.
(C) 1999 Elsevier Science B.V. All rights reserved.