Workload balancing in the manufacturing environment: a multicriteria trade-off analysis

Citation
M. Kuula et al., Workload balancing in the manufacturing environment: a multicriteria trade-off analysis, INT J PROD, 37(7), 1999, pp. 1459-1477
Citations number
28
Categorie Soggetti
Engineering Management /General
Journal title
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
ISSN journal
00207543 → ACNP
Volume
37
Issue
7
Year of publication
1999
Pages
1459 - 1477
Database
ISI
SICI code
0020-7543(19990510)37:7<1459:WBITME>2.0.ZU;2-Q
Abstract
We describe an application of a custom-designed model-based decision tool s ystem to analyse the workload balancing problem at an assembly plant of Nok ia Telecommunications, a Finnish manufacturer of highly customized electron ic products. Our system was designed to control effectively and manage the production process of electronic devices for telecommunications link system s and satellite communications systems, among others. It assisted managemen t in determining accurate workload forecasts, in anticipating bottlenecks i n the production process, and in providing recommendations regarding how to distribute the production load optimally over the planning horizon. In par ticular, the system facilitated a trade-off analysis between important comp etitive factors, such as system throughput time and labour costs. Interesti ng side benefits emerged from the study.