RISK-COST APPROACH TO INTERIM DRAINAGE STRUCTURE DESIGN

Authors
Citation
Jcy. Guo, RISK-COST APPROACH TO INTERIM DRAINAGE STRUCTURE DESIGN, Journal of water resources planning and management, 124(6), 1998, pp. 330-333
Citations number
12
Categorie Soggetti
Engineering, Civil","Water Resources
ISSN journal
07339496
Volume
124
Issue
6
Year of publication
1998
Pages
330 - 333
Database
ISI
SICI code
0733-9496(1998)124:6<330:RATIDS>2.0.ZU;2-K
Abstract
An interim drainage structure provides short service during the constr uction months of the permanent drainage structure. This study presents a risk-cost approach by which the design flood for an interim drainag e structure can be derived from the capacity of the permanent structur e, cost-capacity ratio, cost-damage ratio, and construction months dur ing a year. To accommodate various construction periods in a year, the design capacity for such a temporary drainage structure can be adjust ed to the monthly rainfall or runoff distribution at the project site. Design charts were produced for the break-even economic condition usi ng the Gumbel distribution for annual maximum analysis. Similar soluti ons were also achieved using the Exponential distribution for annual e xceedance analysis. Design methodology presented in this paper provide s an objective basis for selecting construction months and sizing the interim drainage structures.