ITER BAFFLE MODULE SMALL-SCALE MOCK-UPS - FIRST WALL THERMOMECHANICALTESTING RESULTS

Citation
Y. Severi et al., ITER BAFFLE MODULE SMALL-SCALE MOCK-UPS - FIRST WALL THERMOMECHANICALTESTING RESULTS, Fusion engineering and design, 39-4, 1998, pp. 559-567
Citations number
7
Categorie Soggetti
Nuclear Sciences & Tecnology
ISSN journal
09203796
Volume
39-4
Year of publication
1998
Pages
559 - 567
Database
ISI
SICI code
0920-3796(1998)39-4:<559:IBMSM->2.0.ZU;2-2
Abstract
The EU-Home Team is in charge of the R&D related to the ITER Baffle Fi rst Wall. Five small-scale mock-ups, using Be, CFC and W tiles and dif ferent armour/heat-sink material joints under development, have been f abricated and thermomechanically tested in FE200 (Le Creusot) and JUDI TH (Julich) Electron Beam facilities. The small-scale mock-ups have be en submitted to thermo-mechanical fatigue tec;ts (up to failure using accelerating techniques). The objective was to determine the performan ces of the armour material joints under high heat flux cycles. (C) 199 8 Elsevier Science S.A. All rights reserved.