This paper sets down the raison d'etre of the Teesside Development Cor
poration and develops the strategy of the River Tees Barrage, one of t
he eleven flagship projects undertaken by the Corporation, The numerou
s studies that were carried out in order to establish the impact of th
e barrage on the environs of Teesside are described and the informatio
n required to be placed before Parliament is highlighted, The parliame
ntary procedures which enabled the River Tees Barrage and Crossing Act
1990 to be placed on the statute book are set down. Finally, the meth
od of procurement of the engineering work is described.