TEES-BARRAGE .3. DESIGN OF THE BRIDGE

Citation
Dw. Stevens et al., TEES-BARRAGE .3. DESIGN OF THE BRIDGE, Proceedings of the Institution of Civil Engineers. Municipal engineer, 109(3), 1995, pp. 168-176
Citations number
2
Categorie Soggetti
Engineering, Civil
ISSN journal
09650903
Volume
109
Issue
3
Year of publication
1995
Pages
168 - 176
Database
ISI
SICI code
0965-0946(1995)109:3<168:T.DOTB>2.0.ZU;2-1
Abstract
This paper describes how the design for the tubular steel arch bridge which crosses the River Tees Barrage has been developed from the origi nal architectural concept. Decisions made during the design process ar e discussed, and insights into the unusual behaviour of the structure gained from detailed computer analysis are highlighted, Other structur es associated with the Barrage and the fabrication and erection of the main bridge are described.