Competitive markets expose transmission planners to new uncertainties. Thes
e are handled using a decision-analysis approach whose key contribution is
quantifying and minimizing risk. The method is applied using existing and g
enerally-available software tools. The result is a transmission plan which
is robust in the face of uncertainties. A study of a major proposed Central
-American interconnection illustrates the problem and the method.