An automated stringing facility has been built for the KLOE Drift Cham
ber under construction at LNF. Due to the large number of wires, we ne
ed to reduce the possibility of errors and the time of each operation.
The stringing facility uses three robots remotely controlled by two c
omputers running LabVIEW. All the operations will be made in a clean r
oom, class 1000 in the chamber area, 1000 elsewhere, with inside tempe
rature of 20+/-1 degrees C and relative humidity of 50+/-1%.