Cyclic scheduling for re-entrant manufacturing systems

Authors
Citation
K. Yura, Cyclic scheduling for re-entrant manufacturing systems, INT J PRO E, 60-1, 1999, pp. 523-528
Citations number
8
Categorie Soggetti
Engineering Management /General
Journal title
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
ISSN journal
09255273 → ACNP
Volume
60-1
Year of publication
1999
Pages
523 - 528
Database
ISI
SICI code
0925-5273(19990420)60-1:<523:CSFRMS>2.0.ZU;2-A
Abstract
A scheduling method is elucidated for the re-entrant manufacturing systems, where the process route of a job passes production facilities one or more times. The objectives of the scheduling problem are maximization of the pro duction rate as a primary one and minimization of the throughput time as a secondary one. The method makes the cyclic schedule, where an adequate numb er of jobs are treated as a lot and the lot is cyclically released into the system. The lot size is determined to maximize the production rate, and a sequencing method of the lots is developed to minimize the throughput time. (C) 1999 Published by Elsevier Science B.V. All rights reserved.