This paper presents the results of the performance enhancement study in 22
coal fired thermal power stations of capacities 30-500 MW. The efficiencies
and performance indices of the equipment are evaluated which then leads to
the performance evaluation route-operational optimization, simple modifica
tion of equipment or renovation. The generic problems associated with desig
n, operation and fuel inputs is investigated and appropriate solutions are
suggested to improve the boiler efficiency levels from 71-86% to 86-87% imm
ediately and 89-90% on a long term (5-10 yr) basis. A large volume of desig
n and operating data has been analysed and presented in the form of curve f
its for computer simulation of the performance of boilers for high ash coal
s. Copyright (C) 1999 John Wiley & Sons, Ltd.