The problem of a generalized retrofit design of multiproduct batch plants i
s considered in this paper. Unlike previous research on this topic, which c
oncerns only the ways to add a new unit which will be operated in-phase or
out-of-phase with the existing units, we get a better result by altering th
e existing operating mode between existing units (or between new units). Di
sposing of the useless existing units and replacing outworn equipment with
new are also considered. We present a new generalized superstructure with a
concept of 'group', a collection of units operated in-phase, then formulat
e it as an MINLP problem with an implicit or explicit group expression. Fiv
e examples will verify the effectiveness of this method. (C) 1999 Elsevier
Science Ltd. All rights reserved.