Lot streaming is the process of splitting a job or lot to allow overlapping
between successive operations in a multistage production system. This use
of transfer lots usually results in a significantly shorter makespan for th
e schedule. We study the structural properties of schedules which minimize
the makespan for a single job with attached setup times in a flow shop. The
structure of the optimal schedules is more complex than in the case with n
o setups or detached setups, as it may follow a much larger variety of patt
erns. Using the structural insights obtained, however, it is possible to rn
d the optimal solution with s sublots in O(s) time for the three-machine ca
se.