Determining number and timing of substation spare transformers using a probabilistic cost analysis approach

Citation
W. Li et al., Determining number and timing of substation spare transformers using a probabilistic cost analysis approach, IEEE POW D, 14(3), 1999, pp. 934-939
Citations number
15
Categorie Soggetti
Eletrical & Eletronics Engineeing
Journal title
IEEE TRANSACTIONS ON POWER DELIVERY
ISSN journal
08858977 → ACNP
Volume
14
Issue
3
Year of publication
1999
Pages
934 - 939
Database
ISI
SICI code
0885-8977(199907)14:3<934:DNATOS>2.0.ZU;2-Y
Abstract
Compared to the N-1 security design principle in each substation, common sp are transformers shared by multiple substations can avoid considerable capi tal expenditure and still assure a sufficient reliability level. Using comm on spare transformers has been already a practice of some utilities in dist ribution substation transformer planning. This paper presents a probabilist ic approach to determining the number and timing of spare transformers shar ed in a substation group. The proposed approach is based on the aging failu re model of transformers, the overall reliability analysis and the probabil istic damage cost model for a substation group, the capital cost model for spares and the present value method. The spare transformer scheme obtained using the presented approach provides both cost efficiency and sufficient r eliability. A single transformer substation group in a non-urban region is given as an application example to illustrate the procedure of the method.