A hybrid method is presented for the design of inspection stations in
serial production systems. The hybrid method combines a constrained bo
ttleneck shortest path algorithm and discrete event simulation. The ne
twork method determines the allocation of the inspection stations and
the simulation helps the decision maker estimate accurately the possib
le outcome of the allocation. A computational study with the method is
performed based on a practical problem. Other aspects related to the
application of the method to real problems are also discussed.