Rational subgroups of size n = 1 are frequently encountered in process moni
toring and control. The Shewhart control chart for individuals is often use
d in these situations. It is well-known that the in-control average run len
gth (ARL) of this chart is 370.4 under the assumption that the observations
are selected at random from a normal population. When the assumption of no
rmality is violated, the ARL of the individuals control chart is adversely
affected. We show that an exponentially weighted moving average (EWMA) cont
rol chart can be designed so that it is robust to the normality assumption,
that is, so that the in-control ARL is reasonably close to the normal-theo
ry value for both skewed and heavy-tailed symmetric non-normal distribution
s. The EWMA chart also performs quite well in detecting shifts in the proce
ss mean.