Af. Glebov et al., Efficiency of 3D-siesmic survey (3D-common depth point) during reserves specification stage and development drilling optimization, NEFTY KHOZY, (5), 1999, pp. 22-26
Retrospective evaluation of 3D siesmic survey possibilities for development
drilling cost reduction at Poludennoye oil field is presented. Compared ar
e structure plan, prediction map and bar charts of saturated thicknesses of
Yu-1 productive formation at Zapadno-Poludennoye oil field. Expediency of
drilling at north-western part of Zapadno-Poludennoye field is stated and r
ejection of such at its southern part is recommended.