Modernization of the sinter plant at CST, Brazil, featuring pallet width extension technology

Citation
Elm. Harano et al., Modernization of the sinter plant at CST, Brazil, featuring pallet width extension technology, REV METALL, 96(3), 1999, pp. 321-330
Citations number
1
Categorie Soggetti
Metallurgy
Journal title
Revue de métallurgie
ISSN journal
00351563 → ACNP
Volume
96
Issue
3
Year of publication
1999
Pages
321 - 330
Database
ISI
SICI code
Abstract
In 1994, CST decided to increase the total crude steel production from 3.5 to 4.5 million t/y. This required the construction of a second blast furnac e and an increase of about 35 % of the sintering capacity A modernization a nd extension of the existing sintering facility was considered as preferabl e to the construction of a second sinter plant. This was carried out in a t wo phase project the first of which being described hereafter This phase co nsisted in extending the sinter pallet width and simultaneously upgrading m ajor equipment units.